Tower Restructure-Frederick-Maryland-United States Tower Services, LTD.
United States Tower Services Ltd - Communications Self-support Tower Restructure
Phone:
301.874.5885
Email USTS
Home
About USTS
Request Information
Contact Us
Services
Tower Construction
Services
Tower Repair and
Maintenance
Portfolio Gallery
HF Antenna-Tower
Installation and
Towers Removal
Public Safety and
Transportation
Operations Center
Communications &
Telemetry Support
Tower Construction
Communications
Self-support Tower Restructure
HF Radio Multiple
Tower Arrays
FM Shark Cage
Antenna Installation
High-Intensity Dual
Lighting Installation
Please visit
United
States Antenna Products
for details of all our products.
All Categories
>
Portfolio Gallery
>
Communications Self-support Tower Restructure
Download PDF
Printable Page
Email This Page
Save To Favorites
Communications Self-support Tower Restructure
Download PDF
Email This Page
Save To Favorites
larger image
After analyzing this 382-foot communications self-support tower and finding that components were reaching maximum design loads, we undertook a project to restructure the tower, which included the use of temporary bracing for complete removal and the replacement of bracing. Custom-made redundant bracing was also added.
First, a custom-designed temporary brace system was engineered to allow component removal. A rigging plan was composed to accommodate the removal of key bracing, and to serve as a means of lifting personnel to otherwise inaccessible locations on each of the three faces of the tower. A man-rated hoist and trolley line were used in this process, and all hardware and steel components were removed and replaced. The project took 7 weeks from start to finish.
Specifications
Capabilities Applied/Processes
A custom designed temporary brace system was engineered to provide for component removal. A rigging plan was necessary to accommodate the removal of the key bracing along with lifting personnel to inaccessible locations.
Equipment Used on the Tower
Man-Rated Hoist & Trolley Line
Overall Tower Size
382’ self-support tower
Construction Methods
The tower was rigged several times to access the three faces of the tower. The tower was fitted with custom temporary bracing to accommodate removal and replacement of bracing. All hardware and steel components removed were replaced with new.
Logistics
All materials and tools were delivered to the customer on site by United States Tower Services.
Materials Worked With
Engineered Structural Steel and Hardware
Industry for Use
Government
Restructuring Location
Pennsylvania
Standards Met
Tower Analyzed according to ANSI/TIA-222-G
Completion Time
7 weeks
Tower Type
Self-support HF antenna tower
MORE IMAGES
·
New Bracing
·
New Clamp
·
Overall View
·
Detail View
·
New Antenna Mounts
·
New Lighting