Telemetry Support-Frederick-Maryland-United States Tower Services, LTD.
United States Tower Services Ltd - Communications & Telemetry Support Tower Construction
Phone:
301.874.5885
Email USTS
Home
About USTS
Request Information
Contact Us
Services
Tower Construction
Services
Tower Repair and
Maintenance
Portfolio Gallery
HF Antenna-Tower
Installation and
Towers Removal
Public Safety and
Transportation
Operations Center
Communications &
Telemetry Support
Tower Construction
Communications
Self-support Tower Restructure
HF Radio Multiple
Tower Arrays
FM Shark Cage
Antenna Installation
High-Intensity Dual
Lighting Installation
Please visit
United
States Antenna Products
for details of all our products.
All Categories
>
Portfolio Gallery
>
Communications & Telemetry Support Tower Construction
Download PDF
Printable Page
Email This Page
Save To Favorites
Communications & Telemetry Support Tower Construction
Download PDF
Email This Page
Save To Favorites
larger image
Working with a steel tower, rebar, and concrete, this project involved the design, construction, and installation of a 180-foot communications and telemetry support tower. The tower itself was made of extra-heavy, solid steel in an effort to adhere to the client’s tight tolerances. Additionally, clusters of antennas were mounted on the tower and held in a constant position to enable the calibration of a 18.2 meter and 5.2 meter up/downlink satellite tracking dishes.
The construction site included two communications shelters, and was completed using geotech fabric, gravel, and chain-link fencing. All materials and tools were delivered to the client on location by USTS and a subcontractor.
The drilled caisson tower foundation was leveled with a transit, and concrete was delivered by a local plant. The transmission lines were then installed in concrete duct banks, and the tower was assembled on the ground and erected by a 100-ton crane. Because the tower was fitted with work access platforms, United States Tower Services provided climber training for the customer staff. Rebar cages were tied by the local subcontractor. Inspections and testing were performed on the foundation and rebar cage, and anchor bolts were replaced. Concrete testing and crane testing were also done in-process, and all antennas and coaxial systems were swept after installation. The project took 5 weeks to complete.
Specifications
Capabilities Applied/Processes
The augmented grounding system was designed and installed using several specialized ground rods.
The site included two communication shelters and was completed with geotech fabric, gravel, and chain link fencing.
The tower was designed by the manufacture based on the design loads required and installed with a crane.
The tower was fitted with work access platforms.
USTS provided climber training for the customer staff.
Equipment Used to Install Tower
100 Ton Crane
Bob Cat skid Loader
Caisson Drill Rig
Concrete Pump
Track Back Hoe
Overall Tower Size
180’ tower
Construction Methods
Concrete was delivered from local concrete plant.
Rebar cages were tied by the subcontractor.
The drilled caisson tower foundation was leveled with transit.
Tower was assembled on ground and erected by crane.
Transmission lines were installed in concrete duct bank trenches.
Logistics
All materials and tools were delivered to the customer on site by United States Tower Services or the subcontractor.
Materials Worked With
Concrete
Rebar
Steel Tower
Finishing
Site Finish Grade Material
In process Inspections performed
Foundation excavation, rebar cage, anchor bolt placement, concrete testing and crane.
All antennas and coax systems were swept after installation.
Industry for Use
Government/Space Research
Installation Location
Mid Atlantic USA
Completion Time
5 weeks
Tower Type
Self support HF antenna tower and self support UHF/VHF antenna tower
MORE IMAGES
·
Antenna View
·
Antenna Detail
·
Antenna Detail-2
·
Antenna View-2
·
Tie Down Lug
·
Safety Tags
Registered with
CCR Gov.
Site Created by
ThomasNet Web Solutions
and Powered by
Navigator Platform