Public Safety and Transportation Operations Center-Frederick-Maryland-United States Tower Services, LTD. United States Tower Services Ltd - Public Safety and Transportation Operations Center
Phone: 301.874.5885 Email USTS
Services Tower Construction
Services
Tower Repair and
Maintenance
Portfolio GalleryHF Antenna-Tower
Installation and
Towers Removal
Public Safety and
Transportation
Operations Center
Communications &
Telemetry Support
Tower Construction
Communications
Self-support Tower Restructure
HF Radio Multiple
Tower Arrays
FM Shark Cage
Antenna Installation
High-Intensity Dual
Lighting Installation
All Categories > Portfolio Gallery > Communications & Telemetry Support Tower Construction > Communications Self-support Tower Restructure > Tower Construction Services > Tower Repair and Maintenance > HF Radio Multiple Tower Arrays > FM Shark Cage Antenna Installation > High-Intensity Dual Lighting Installation  > HF Antenna-Tower Installation and Towers Removal > Public Safety and Transportation Operations Center 
    Download PDF Download PDF     Printable Page     Email Email This Page     Save To Favorites Save To Favorites
Request Information

Public Safety and Transportation Operations Center



    Download PDF Download PDF  
    Email Email This Page  
    Save To Favorites Save To Favorites
  

Profile 2

larger image
Our project involved the installation of antennas and coaxial cables on the roof of the newly completed PSTOC, and 96 antennas and coaxial cables on the monopole. Five cables ran to the top mounted antennas, and the monopole received runs to each platform antenna mounting location. All work was performed by hand with a rope and pulley, to decrease the likelihood of damage to the other coaxial cables.

The custom antenna mounts and cable brackets were all delivered to the customer on site by USTS, and the top of the pole was rigged to a small gin-pole to enable access to the four platforms. Multiple coaxial cables were pulled through complex conduits from the radio rooms to the roof, and into the monopole. The tower was analyzed according to ANSI/TIA-222-G standards, and took 8 months to complete.





Specifications

Capabilities Applied/Processes

Pulling multiple coax cables through complex conduits from the radio rooms to the roof and into the monopole.

Equipment Used on the Monopole

All work was pre-formed by hand with a rope and pulleys to eliminate the risk of damaging the other coax.

Construction Methods

The pole was rigged at the top to a small gin-pole to access the four platforms and top. Some conduits were lined with “MAXCELL” to accommodate additional coax.

Logistics

All materials and tools were delivered to the customer on site by United States Tower Services.

Materials Worked With

Custom antenna mounts and cable brackets.

Industry for Use

Public Safety

Location

Virginia

Standards Met

Tower Analyzed according to ANSI/TIA-222-G

Completion Time

8 Months


 MORE IMAGES 

· Inside Cabling

· Parapet Antennas

· Mounting Detail

· Wall Penetrations

· Overall View

· Monopole

· Overall View-2


Request Information
United States Tower Services, LTD. | Global Communications Infrastructure